
We are pioneers in power electronics industry.
ERAM Power Electronics Company has successfully completed a vital project for Water Transmission and Technologies Co (WTTCO) and Saline Water Conversion Company (SWCC). The Al Moghammas Reservoir Transmission Systems project involves the construction of an independent strategic water reservoir (ISWR) with a capacity of 2,400,000 cubic meters in the Makkah region.
We're thrilled to share the success of our recent industrial training program conducted for Saudi Technology and Security Comprehensive Control Company personnel on CellWatt Lithium Batteries and Battery chargers. Hosted right here at our cutting-edge factory, this comprehensive training brought together personnel from different parts of Saudi Arabia to dive into the nuances of lithium battery technology.
A group of 34 students and staff from ITQAN Institute visited Eram Power Electronics Company last week as a part of their industrial training program. The Inspection Technology and Quality Assurance National Institute (ITQAN) is a state-of-the-art institute that aims at inspiring passion for excellence, provides world-class training programs, and support the Kingdom’s workforce and nationalization efforts.
Eram Power Electronics Company partnered with Saline Water Conversion Corporation (SWCC) to replace their Battery Chargers and UPS Systems with our Linegate Battery Chargers and Sinegate Industrial UPS Systems. The project includes replacement of 27 Battery Chargers of rating 125 VDC 20 A, 24 VDC 125 A, 24 VDC 150 A, 24 VDC 200A, 24 VDC 350 A and 12 UPS of capacities 5 kVA, 10 kVA, 80 kVA and systems are supported by VRLA Maintenance free batteries. The Chargers are parallel redundant type with active load sharing and the UPS Systems are with maintenance bypass panel. The project scope includes Factory Acceptance Tests at our Dammam manufacturing Facility, Installation and Commissioning, Familiarization program for SWCC Engineers, Preventive Maintenance Visits and Spare Parts Package.